首页 > > 详细

代做MEDA 37028. Post-Production Supervisor Breakdown Edit Structure代做R语言

项目预算:   开发周期:  发布时间:   要求地区:

MEDA 37028. Post-Production Supervisor

Post-Production Manual: Breakdown Edit Structure

Brief Prior to the offline, a breakdown edit structure is generated to serve as a guide or

template for the editor to help them keep to time. In the television world, it aids in keeping the acts structured, content-wise and length-wise, between the commercial breaks.  Generate a breakdown structure for a BFTV project that you   are post-supervising. No commercial breaks added.

Deadline           Due end of Week 11 March 27th, 2025 by 11:59pm

- Save the Excel document as: Last name_Breakdown

- Submit the Excel document to Slate:

(Assessment – Assignments – Post Binder: Edit Breakdown)

Components

- Decide what the sections of your project are. To help, do the following:

- Watch this Mini Doc (6mins): https://vimeo.com/48857883 (Warning: Graphic images)

- Look at the Sample_Breakdown (Slate > Content > Assignments > Post Manual)

- Include a title at the top of the chart (e.g. name of the production & chart type)

- Have a Timecode Column

- Have a Duration Column (these can be small ranges)

- Have a Section Column (min. 5 sections: Intro & credits count)

- Total the time at the bottom

- Colour code the chart in a repeated pattern for visual interest

- Use font style/font / alignment that is legible

- Send this to your editor

Objectives Practice using Excel

Think through project elements

Pay close attention to details

Evaluation: The assignment is worth 3% of your final grade:

This assignment is due on the above date during your section.

Late submissions will result in a penalty of 10% per day.

If delivered after 7 calendar days (1 week late), it will result in a zero.

All components must be completed individually.





软件开发、广告设计客服
  • QQ:99515681
  • 邮箱:99515681@qq.com
  • 工作时间:8:00-23:00
  • 微信:codinghelp
热点标签

联系我们 - QQ: 9951568
© 2021 www.rj363.com
软件定制开发网!