首页 > > 详细

代做MBS4242 System Design B Building requirement 2024代做留学生SQL语言

项目预算:   开发周期:  发布时间:   要求地区:

MBS4242 System Design B

IVE(ST)2024

Building requirement

1.   Main usage: Office

2.   Building height:

 

Typical floor height (m)

No. of typical   floor excluding G/F and R/F

G/F height (m)

Total height

Group 1

2.8

38

4

100.4

Group 2

2.9

37

3.9

111.2

Group 3

3

36

3.8

111.8

Group 4

3.1

35

3.7

112.2

Group 5

3.2

34

3.6

112.4

Group 6

3.3

33

3.5

112.4

Group 7

3.4

32

3.4

112.2

Group 8

3.5

31

3.3

111.8

Group 9

3.6

30

3.2

111.2

Group 10

3.7

29

3.1

110.4

3.   Room type:

Interior zone: Open plan office

Perimeter zone: Manger room, admin office, conference room, Other: Toilets, pantry and plant room

4.   HVAC system:

a.    Air distribution:

AHU with space diffuser for open plan office

PAU + fan coil for manager room, admin office and conference room Fan coil + transfer air for toilet

b.   Ventilation: toilet, pantry plant room

c.    Water cooled chiller shall be used

5.   EL system

a.     One twin S/O for each seat reserve for office equipment

b.     One water-proof fuse spur unit for each basin, urinal and WC

c.    One twin S/O for pantry

d.     One S/O for each plant room

e.     Three twin S/O in each conference room reserve for office equipment f.      Additional one twin S/O for each individual rooms for general use

g.     S/O shall be reserved for general cleansing

h.     Additional power point can be proposed for other office equipment (e.g. printer, office logo, TV, water machine and microwave etc.)


软件开发、广告设计客服
  • QQ:99515681
  • 邮箱:99515681@qq.com
  • 工作时间:8:00-23:00
  • 微信:codinghelp
热点标签

联系我们 - QQ: 9951568
© 2021 www.rj363.com
软件定制开发网!