首页
网站开发
桌面应用
管理软件
微信开发
App开发
嵌入式软件
工具软件
数据采集与分析
其他
首页
>
> 详细
QBUS6820代做、Python编程语言代写
项目预算:
开发周期:
发布时间:
要求地区:
QBUS6820: Prescriptive Analytics Assignment 1 Semester 1, 2024
Instructions: Submit your answers in one pdf document with each question/part labelled clearly. You
must also submit your code - the raw code (.ipynb file) and a html version of your Jupyter Notebook.
Problem 1: Investing (6 marks)
Suppose a friend of yours wants to invest $10,000 and has asked for your help. They’re thinking of
investing in an index fund tied to the ASX200 and a tech stock fund, but they’re concerned about
the volatility of tech stocks. They therefore want to take measures to manage their investment risk.
They’ve decided that the amount invested in the tech fund cannot be higher than twice the amount
invested in the index fund. The price per share of the index fund is $17, and the price per share of
the tech fund is $20. Over the last 5 years, the average annual return for the index fund has been
15%, and 25% for the tech fund. They expect the performance of the funds in the coming year to be
identical to the recent past. Your friend wants to develop an investment strategy that will maximise
their return for the coming year.
(a) Formulate a linear programming model to help determine how much money they should invest
in each fund.
(b) Solve the model using Python.
(c) If your friend can get $1 more to invest, how will that affect the solution? $2 more? $3 more?
What can you say about the return on their investment strategy given these changes.
Problem 2: Producing wine (7 marks)
A winery produces and sells three types of wine across Australia — No.1, No.2, and No.3. A few
months ago management discovered a large number of grapevines in the vineyard were infested with
an insect pest that feeds on their roots and eventually kills them. They had no choice but to take
out all the grapevines and replant their crop. It will take years for the new vines to mature and
produce grapes so in the meantime they must purchase grape juice from other vineyards to make
their wine.
There are three vineyards that are willing to sell their grape juice to the company - A, B, and C.
They are located in different and faraway parts of the country. As such, the company is looking
at using more conveniently located winemaking and bottling facilities instead of its own. It has
identified 4 facilities: W, X, Y, and Z.
In a particular month vineyard A can supply 1,500 tons of grape juice, vineyard B 1,600 tons, and
vineyard C 1,000 tons. The processing capacity per month at facility W is 1,300 tons, 1,000 tons at
X, 1,300 tons at Y, and 1,500 tons at Z. The $ cost per ton of transporting juice from the vineyards
to the facilities is as follows:
W X Y Z
A 850 720 910 750
B 970 790 1,050 880
C 900 830 780 820
The processing facilities have different equipment and have different wage rates. The cost of processing each type of wine at each plant ($/ton) therefore differs, and is as follows:
W X Y Z
No.1 2,100 2,350 2,200 1,900
No.2 4,100 4,300 3,950 3,900
No.3 2,600 2,300 2,500 2,800
This month the company needs to process a total of 1,400 tons of No.1, 800 tons of No.2, and 600
tons of No.3 at the four facilities combined. There are two complicating factors though. To produce
1 ton of No.2 requires 2 tons of grape juice, and 1 ton of No.3 requires 1.5 tons of grape juice. 1 ton
of No.1 requires 1 ton of juice.
The company wants to know how many tons of grape juice to ship from each of the vineyards to each
of the facilities, and the number of tons of each type of wine to produce at each facility to minimise
total costs.
Page 1 of 2
QBUS6820: Prescriptive Analytics Assignment 1 Semester 1, 2024
Problem 3: Assigning groups (7 marks)
Assume you’re a course coordinator assigning 15 students to 5 teams for a project. You want the
project teams to be relatively equal in terms of academic performance and to have a mix of different
skills and domestic/international students. You’ve decided to use students’ grade point average
(GPA) as a proxy for academic performance and to set a minimum average GPA of 2.75 for each
team while also maximising the overall average GPA across teams. You’ve also decided to use
students’ majors as a proxy for different skill sets, but you don’t want there to be more than two of
the same major in any single team. You also want at least one international student on each team,
but not more than two. The following table details the GPA, major, and internationality of each
student in the cohort.
Student GPA International Major
1 3.10 Yes FIN
2 2.30 No ACCT
3 2.31 Yes BA
4 2.10 Yes MKTG
5 3.28 No BA
6 3.90 No FIN
7 2.92 No FIN
8 2.60 No FIN
9 3.17 No FIN
10 3.03 Yes MKTG
11 3.40 Yes MKTG
12 2.73 No ACCT
13 2.66 Yes MKTG
14 2.86 No ACCT
15 3.40 Yes BA
Formulate and solve an integer linear programming model for this problem to determine project
teams that align with your criteria. Do you think your model does a decent job of making sure the
teams are diverse and academically equitable? If not, how might you change your model to achieve
a better result?
Page 2 of 2
软件开发、广告设计客服
QQ:99515681
邮箱:99515681@qq.com
工作时间:8:00-23:00
微信:codinghelp
热点项目
更多
代做ceng0013 design of a pro...
2024-11-13
代做mech4880 refrigeration a...
2024-11-13
代做mcd1350: media studies a...
2024-11-13
代写fint b338f (autumn 2024)...
2024-11-13
代做engd3000 design of tunab...
2024-11-13
代做n1611 financial economet...
2024-11-13
代做econ 2331: economic and ...
2024-11-13
代做cs770/870 assignment 8代...
2024-11-13
代写amath 481/581 autumn qua...
2024-11-13
代做ccc8013 the process of s...
2024-11-13
代写csit040 – modern comput...
2024-11-13
代写econ 2070: introduc2on t...
2024-11-13
代写cct260, project 2 person...
2024-11-13
热点标签
mktg2509
csci 2600
38170
lng302
csse3010
phas3226
77938
arch1162
engn4536/engn6536
acx5903
comp151101
phl245
cse12
comp9312
stat3016/6016
phas0038
comp2140
6qqmb312
xjco3011
rest0005
ematm0051
5qqmn219
lubs5062m
eee8155
cege0100
eap033
artd1109
mat246
etc3430
ecmm462
mis102
inft6800
ddes9903
comp6521
comp9517
comp3331/9331
comp4337
comp6008
comp9414
bu.231.790.81
man00150m
csb352h
math1041
eengm4100
isys1002
08
6057cem
mktg3504
mthm036
mtrx1701
mth3241
eeee3086
cmp-7038b
cmp-7000a
ints4010
econ2151
infs5710
fins5516
fin3309
fins5510
gsoe9340
math2007
math2036
soee5010
mark3088
infs3605
elec9714
comp2271
ma214
comp2211
infs3604
600426
sit254
acct3091
bbt405
msin0116
com107/com113
mark5826
sit120
comp9021
eco2101
eeen40700
cs253
ece3114
ecmm447
chns3000
math377
itd102
comp9444
comp(2041|9044)
econ0060
econ7230
mgt001371
ecs-323
cs6250
mgdi60012
mdia2012
comm221001
comm5000
ma1008
engl642
econ241
com333
math367
mis201
nbs-7041x
meek16104
econ2003
comm1190
mbas902
comp-1027
dpst1091
comp7315
eppd1033
m06
ee3025
msci231
bb113/bbs1063
fc709
comp3425
comp9417
econ42915
cb9101
math1102e
chme0017
fc307
mkt60104
5522usst
litr1-uc6201.200
ee1102
cosc2803
math39512
omp9727
int2067/int5051
bsb151
mgt253
fc021
babs2202
mis2002s
phya21
18-213
cege0012
mdia1002
math38032
mech5125
07
cisc102
mgx3110
cs240
11175
fin3020s
eco3420
ictten622
comp9727
cpt111
de114102d
mgm320h5s
bafi1019
math21112
efim20036
mn-3503
fins5568
110.807
bcpm000028
info6030
bma0092
bcpm0054
math20212
ce335
cs365
cenv6141
ftec5580
math2010
ec3450
comm1170
ecmt1010
csci-ua.0480-003
econ12-200
ib3960
ectb60h3f
cs247—assignment
tk3163
ics3u
ib3j80
comp20008
comp9334
eppd1063
acct2343
cct109
isys1055/3412
math350-real
math2014
eec180
stat141b
econ2101
msinm014/msing014/msing014b
fit2004
comp643
bu1002
cm2030
联系我们
- QQ: 9951568
© 2021
www.rj363.com
软件定制开发网!