首页
网站开发
桌面应用
管理软件
微信开发
App开发
嵌入式软件
工具软件
数据采集与分析
其他
首页
>
> 详细
COMP 250代做、代写java编程设计
项目预算:
开发周期:
发布时间:
要求地区:
Final Project
COMP 250 Fall 2023
posted: Monday, Dec. 4, 2023
due: Wednesday, Dec. 20, 2023 at 23:59
General instructions
• Submission instructions
– Please note that the submission deadline for the final project is very strict. No submissions
will be accepted after the deadline.
– As always you can submit your code multiple times but only the latest submission will be kept.
We encourage you to submit a first version a few days before the deadline (computer crashes
do happen and code post may be overloaded during rush hours).
• These are the files you should be submitting on Ed:
– Tile.java
– DesertTile.java
– FacilityTile.java
– MetroTile.java
– MountainTile.java
– PlainTile.java
– ZombieInfectedRuinTile.java
– Graph.java
– GraphTraversal.java
– TilePriorityQ.java
– PathFindingService.java
– ShortestPath.java
– FastestPath.java
– SafestShortestPath.java
Do not submit any other files, especially .class files. Any deviation from these requirements may
lead to lost marks
• Starter code is provided for this project. Do not change any of the class names, file names, or method
headers. You can add helper methods or fields if you wish. Note also that for this project, you are
NOT allowed to import any other class (all import statements other than the one provided in the
starter code will be removed). Any failure to comply with these rules will give you an automatic 0.
1
• The project shall be graded automatically. Requests to evaluate the project manually shall not be
entertained, so please make sure that you follow the instruction closely or your code may fail to pass
the automatic tests.
• Whenever you submit your files to Ed, you will see the results of some exposed tests. These tests are
a mini version of the tests we will be using to grade your work. If your code fails those tests, it means
that there is a mistake somewhere. Even if your code passes those tests, it may still contain some
errors. We will test your code on a much more challenging set of examples. We highly encourage
you to test your code thoroughly before submitting your final version.
• By next week we will share with you a Minitester class that you can run to test if your methods
are correct. This class is equivalent to the exposed tests on Ed. Please note that these tests are only a
subset of what we will be running on your submissions. We encourage you modify and expand this
class. You are welcome to share your tester code with other students on Ed. Try to identify tricky
cases. Do not hand in your tester code.
• You will automatically get 0 if your code does not compile.
• Failure to comply with any of these rules will be penalized. If anything is unclear, it is up to you to
clarify it by asking either directly a TA during office hours, or on the discussion board on Ed.
2
Learning Objectives
This project is meant for you to practice working with graphs and solve some practical problems related
to it. You will realize from the starter code and the pdf instuctions, that for this project you have a
little more freedom in your implementation choices compared to previous assignments. You will start
by implementing both a DFS and a BFS traversal. Then you’ll spend sometime implementing two data
structures: one representing a weighted graph, and the other a priority queue. Finally, you will dive into
the implementation of Dijkstra’s algorithm for finding the shortest path on a given graph. You will learn
more about why this algorithm finds the optimal solution in COMP 251.
Project set up
For this project, you can use a GUI (provided) that is programmed in JavaFX, so you need to set up JavaFX
in your IDE properly. Please note, that the use of the GUI is not necessary to successfully complete the
project.
• For Intellij user (recommended):
– Windows user: It should be already included in the SDK if you are using Java 1.8 or higher.
– Mac user: By default you laptop might be using Amazom Correto distribution, you need to
change it to Liberica distribution to support media.
1. open File → Project Structure → SDKs → Add → Download new SDKs → Select Liberica and install it
2. In your run configuration, select Liberica as your build SDK and build the project
• For Eclipse user:
– Windows user: You need to install JavaFX library manually
1. In Help menu, in Install new software wizzard you should add the new site location to
find proper software. Use ”Add” button, then in ”name” section type ”e(fx)clipse (or anything you want, it does not matter). In ”location” section type: https://download.
eclipse.org/efxclipse/updates-nightly/site/
2. Search downloadable package by applying a filter ”e(fx)clipse” you should see a list of
options (such as JavaFX SDK)
3. Install them all, after that Eclipse will restart
4. In Eclipse select the project, run Project → Preferences → Java Build Path → Add Library
→ Select JavaFX SDK, then rebuild the project, all errors should go away
– Mac user: switch to Intellij
3
Introduction
Figure 1: Referred from [1]
In a not-so-distant future, a zombie apocalypse has ravaged the planet and made resources scarce. A few
years post-apocalypse, mother nature has taken its course once more and covered the world in lush greenery. Cities turned to ruins and became a hub for zombies to hide during the day while at night they roam
and hunt for new flesh. Resource gathering time is limited and over the years, the use of technology has
dwindled to a select few who are capable. You are among the rare few who are still capable of programming. Luckily, one of the elders has assigned you the task of creating an app, that will help our people
scavenge for resources while also avoiding the zombies. The responsibility now lies on your shoulders as
this app could help all of humanity scavenge and fight against the undead.
Thankfully, you do not need to start from scratch, because you accidentally found an old map app in the
computer that can provide a simple graphic interface (GUI). However, the underlying main functionalities
have been corrupted so you need to finish the rest for it to work properly.
Path finding from your infected house to a safe house
Your main task for coding this app is to consider all the different elements of nature like desert, mountains,
etc, and to devise a plan to travel to the safe house.
On the way to the safe house, one might have to gather some supplies, travel through the metro and even
4
kill some of those pesky zombies. Being able to successfully compute the best route to take in order to
reach the safe house would make the risk of getting out there calculated and worth taking.
Now hurry up and get to coding before the zombies come knocking on your door!!
GUI
Luckily for you the GUI of the app is still functional and has the following sections:
• Menu: The menu provides ways to navigate through maps and also supports functionalities to
modify the GUI visual output.
– Control: basic command to manipulate the map.
– Maps: where to initialize maps.
– View: utility functions related to map display:
* Display system log: a toggle whether or not to show the system log.
* Display tile text: a toggle on whether or not to show text for each tile in the map.
* Display grid: a toggle whether or not to show grid border.
• Main map display: Different parts of the city are modeled as maps and are displayed here in a 2D
fashion. The layout of the map, the departure and destination points, and the suggested paths are
displayed here.
• Commanding panel: This is where different commands are issued based on users’ needs. Your
main task would be writing the code for each button and making sure they are executed correctly.
• Console panel: This is where important messages are displayed, including system messages and
user messages.
Figure 2: GUI
5
Map
The map is 2D grid-based for easy demonstration. It consists of six different base regions, plains, deserts,
mountains, facilities, and zombie-infected ruins. It also labels the location of the departure and the destination. Mountains are generally hard to cross so they can be treated as a non-travelable obstacle. The rest
of the tiles can be traveled through with a certain cost in the distance, time, and damage. For example,
the desert region may have a straightforward path that is short in distance, but actually traveling through
on foot will take a while. Sometimes, you may want to cut through an abandoned building because it is
shorter and takes less time, but you might run into zombies and put yourself in danger. In this project, you
will try to model these as data and experiment with how this might affect your choice of pathfinding.
(a) Plains (b) Building (c) Zombie (d) Mountains (e) Metro
(f) Desert
Figure 3: Different elements represented in the map[2, 3]
Printing to console
To use the function that shows a message on the GUI, try calling the logMessage() function from the
Logger class. You can use Logger to log messages with the following code:
Logger.getInstance().logMessage(msg:String)
The logger can be accessed anywhere.
Simulating your travel
To ensure that the path devised by your logic is completely accurate, the app has a functionality called
“simulation”. This would simulate your path and help you visualize your course. To start a simulation,
after generating a path successfully, press the simulation button from the Control menu. Turn on the
volume for some nice sound effects.
6
Your Tasks
Level 0: Warming up [5pts]
In preparation to solve your pathfinding task, you first need to create all the necessary parts for visualizing
the outside world on a map. Since the outer world can be modeled using six regions, you first need to
make sure that the data related to those regions is correctly initializes. The GUI is provided the template
for each region as Tile and each specific tile would be a subclass of the Tile class.
The Tile class has several fields that can be accessed directly from all of the other classes:
• isDestination: A boolean variable indicating whether or not this tile is the destination.
• isStart: A boolean variable indicating whether or not this is the tile where our path begins.
• xCoord and yCoord: This tile’s x, y coordinates in the map, starting from top left. The row is x
and the column is y.
• nodeID: A unique index number for each tile object. The only assumption you can make about
this number is that it is unique. You can also modify it, if you like, as long as you keep it unique.
• neighbours: An array list of all the tiles connected to this tile on the map.
• distanceCost, timeCost, and damageCost: The cost of travelling to this tile in terms of
distance, time, and physical damage respectively.
• predecessor, and costEstimate: two fields which you might find useful when implementing
Dijkstra’s algorithm.
Find all the subclasses representing each region inside the tiles folder, and complete their constructors
using the information from the table below:
name/cost distance time damage(risk)
plain 3 1 0
desert 2 6 3
mountain 100 100 100
facility 1 2 0
metro 1 1 2
zombie infected ruins 1 3 5
To test that the costs have been initialized correctly, start GUI and open map 1. Each time you click on
an individual tile, the detailed information about that tile should be printed on the console. Fig 3 gives a
pictorial representation of different elements of nature which can be found in the GUI.
7
Level 1 [10 pts]
Now that you have made sense of the GUI and you have modeled the world, you are ready to give your
first try at implementing an algorithm that would allow you to find a path to the safe house from a given
tile. Being a resourceful developer, you quickly open the book ”Introduction to Algorithms”[4], a holy
grail of Algorithm design, and remember reading something about Breadth First Search(BFS) and Depth
First Search(DFS). You decide to implement these two algorithms to see if they do the job.
Open the GraphTraversal class and implement the two following static methods:
• BFS(Tile start) : This method takes a Tile as input which represents the starting point of
the traversal. It will then traverse the map and find all the reachable tiles from the given input tile
using BFS. It returns an ArrayList containing the Tiles in the same order as they have been
visited.
• DFS(Tile start) : This method takes a Tile as input which represents the starting point of
the traversal. It will then traverse the map and find all the reachable tiles from the given input tile
using DFS. It return an ArrayList containing the Tiles in the same order as they have been
visited.
NOTE: Some tiles are not designed to be traveled through, thus you can use the method isWalkable()
from the Tile class to avoid these obstacle tiles in your traversals.
Testing
To test the correctness of your implementation, open GUI and go to Map 1. Try clicking on BFS traversal
or DFS traversal. You should see a red dotted path that follows the order of visits and visit all reachable
tiles on the map. Fig 4 highlights the expected output for Map 1. Please note that depending on your
implementation of DFS, you might see a different path and that’s ok.
(a) BFS Traversal (b) DFS Traversal
Figure 4: A snapshot of Map 1 for BFS and DFS Traversal
When you work with larger maps, it might be hard to understand the order in which the tiles are reached
just by looking at the path drawn. Try opening [Control]→[Start Simulation] after executing the algorithm,
it may help you visualize the path better.
8
Level 2 [15 pts]
Your initial intuition for using BFS and DFS was a good one. However, it has one major flaw: the path
obtained traverses through all the points around the world to get to the safe house. You quickly notice that
this might not be sustainable, as the complexity(O(n
2
)) increases.
Hence, you go back once again to your trusted textbook and this time you find a better algorithm for
the task at hand: Dijkstra’s algorithm. You remember learning from class, that this algorithm is used to
find the shortest path from point A to point B on a positively weighted graph. 1
In a couple of sections
you’ll finally get to implement it yourself!
To get there though, you first need to think about how to implement the two data structures the algorithm needs. Let’s start by implementing a weighted graph. Open the class Graph. This class defines a
data type to represent a weighted graph. This is also a double directed graph, where the cost of travelling
between two tiles connected by an edge is determined by where we are headed. That is, the edges of the
graphs are directed, and their weight depends on the destination Tile:
weight(Edge(t1, t2)) = cost(t2)
weight(Edge(t2, t1)) = cost(t1)
Depending on the graph you need to build, you will refer to the appropriate cost stored in the Tile object.
Your task is to implement this class so that you can use it to represent a map of the outer world on which
you’d like to eventually build paths with minimum weight. The details of the implementation are left up
to you. In order for us to assign points for this task, we require you to implement at least the following
methods (for which you cannot change the header). You are welcome to add as many fields and methods
(public or private) as you see fit (this includes also overloading any of the methods listed below if
this is what you’d like to do).
• Graph(ArrayList
vertices): a constructor that builds the graph given a list containing all of its vertices. This graph should NOT contain any edges. The constructor should be
used to initialize the vertices of the graph and whichever fields you decided to use in this class.
• addEdge(Tile origin, Tile destination, double weight) : a method adds to
the graph an Edge with the given weight, connecting origin to destination.
• getAllEdges() : a method that takes no inputs and returns an ArrayList containing all the
Edges from this graph.
• getNeighbors(Tile t): a method that takes a Tile as input and returns an ArrayList
containing all the Tiles adjacent to it in this graph.
• computePathCost(ArrayList
path): this methods takes as input a list of Tiles
representing a path. It computes and returns a double indicating the total weight of the path (i.e.
the sum of weights for all edges along the path). You can assume that the input represents a valid
path in this graph.
1For additional details on Dijkstra’s algorithm see here.
9
Please note that inside the Graph class you can find a static nested class called Edge. This class
is meant to represent a directed edge connecting two Tiles in the graph. This class must contain the
following methods/fields (as with Graph you are welcome to add anything that you might find useful for
your own implementation):
• Three fields:
– origin : a Tile indicating where the edge is originating from.
– destination : a Tile indicating where the edge is directed to.
– weight: a double indicating the weight associated to this edge.
• Edge(Tile s, Tile d, int cost): A constructor that uses the inputs to initialize an object of type Edge.
• getStart() and getEnd(): two getters used to access the corresponding Tiles.
Testing
To be able to test your code for this section using the GUI, you will first need to implement Dijkstra’s
algorithm. You are encouraged to test your code on your own before moving forward.
Level 3 [15 pts]
The other data structure that you need to implement before tackling Dijkstra’s algorithm, is a priority
queue. You remember from class that the best way to implement a priority queue is to use a min heap. You
also remember that since heaps are complete binary tree, you had learned a wonderful trick that allowed
you to implement the entire data structure using an array! Open the TilePriorityQ class. This class
is meant to represent a priority queue where the elements are Tiles and they are compared based on the
cost estimated to reach each tile from a source tile. Like for the Graph, you will have some freedom in
your decisions of how to implement the priority queue. In order to assign points for this task, we will
require the following methods to be implemented. You are welcome to add as many fields and methods
(public or private) as you see fit (this includes also overloading any of the methods listed below if
this is what you’d like to do).
• TilePriorityQ (ArrayList
vertices): a constructor that builds a priority queue
with the Tiles received as input.
• removeMin() a method that takes no inputs and removed the Tile with highest priority (i.e.
minimun estimate cost) from the queue.
• updateKeys(Tile t, Tile newPred, double newEstimate): a method that takes
as input a Tile t. If such tile belongs to the queue, the method updates which Tile is predicted
to be the predecessor of t in the minimum weight path that leads from a source tile to t as well as
the estimated cost for this path. Note that this information should be stored in the appropriate fields
from the Tile class, and after these updates, the queue should remained a valid min heap.
Testing
You are highly encouraged to test that your priority queue works as expected before starting to implement
the code from the next section.
10
Level 4 [25 pts]
Let’s now look into the PathFindingService class. This class contains the following public methods:
• A constructor that takes a Tile as input, representing the starting point of the paths we’d like to
compute.
• An abstract void method called generateGraph(). This method, which you’ll need to
override in the PathFindingService’s subclasses, is supposed to build a graph connecting all
reachable tiles (i.e. ignoring the obstacle tiles) from the source tile. It should then use this graph
to initialize the corresponding Graph field. This will be the graph on which our algorithm will
compute the path with a minimum weight.
In addition to the latter, there are the following three methods which will be discussed throughout the
next few sections. As with the previous two classes, you are welcome to add any additional method you
see fit.
• findPath(Tile startNode)
• findPath(Tile start, Tile end)
• findPath(Tile start, LinkedList
waypoints)
You are finally ready to implement Dijkstra’s algorithm. You have been provided with a class named
ShortestPath that extends the
Complete the following tasks to get the shortest distance path
• Step 1: In ShortestPath, implement generateGraph(). The method creates a weighted
graph using the distance cost as weight. This graph should be then stored in the appropriate field.
To make sure that the graph is generated each time a ShortestPath object is created, you should
add a call to this method inside the constructor.
Note: You can use BFS or DFS to help you get a list of all reachable tiles. Remember also that the
graph you want to build should only connect tiles that are designed to be travelled through. You can
use the method isWalkable() to help you figure out which tiles are not just obstacles.
• Step 2: Implement Dijkstra’s algorithm in PathFindingService (Fig 5). Use the algorithm to
implement the findPath(Tile startNode) method. The method uses Dijkstra’s algorithm
on the Graph stored in the field g to find a minimum weight path to the destination from the
input Tile. Note that the result of running Dijkstra’s algorithm is that each node in the graph will
contain the information needed to find the minimun weight path from the source to this node. So,
after running the algorithm you will need to use the infomation stored in the predecessor field
to backtrack and find the list of Tiles that make up the path to be traversed from the start node to
the destination.
11
DIJKSTRA(V, E,w,s):
INIT-SINGLE-SOURCE(V,s)
S ← Q ← V
while Q do
u ← REMOVE-MIN(Q)
S ← S {u}
for each vertex v Adj[u] do
RELAX(u,v,w)
Figure 5: Pseudo-code for Dijkstra’s algorithm
INIT-SINGLE-SOURCE(V,s)
for each v V do
d[v]←
[v]← null
d[s]← 0
Figure 6: Pseudo-code for the initialization
RELAX(u,v,w)
if d[v] > d[u]+w(u,v) then
d[v] ← d[u]+w(u,v)
[v] ← u
Figure 7: Pseudo-code for the relaxing operation
The reason why we are implementing the path-finding algorithm in the PathFindingService
class is that when later creating the second strategy for the time cost you would be using the same Dijkstra’s algorithm so it is much cleaner to write the code in the parent class. However, you need to write
your own graph generation method in the subclass because it is essentially the difference between these
path-finding strategies.
Testing
To test this code, you can open either Map 1 or Map 2 and click on the button “Shortest Path”. A track
will be highlighted in red that will show you the shortest way to reach the safe house. You can click on the
Simulate button to simulate your path. Fig ?? highlights the expected output for both the maps (please note
that the shortest path is not unique. There might be more than one path with the same minimum weight!
Your code does not have to generate the same path as in the figure as long as its weight is minimal).
12
(a) Map 1 (b) Map 2
Figure 8: Shortest path for both maps
Level 5 [5 pts]
In the previous level, you were able to find the shortest path to the safe house. Unfortunately, that is not
enough as you would need to gather supplies to survive in the wild. To make sure that the app is realistic
and considers this constraint, you are provided with a functionality called “Add Waypoints”. You can
place the waypoints manually using the GUI. For placing waypoints you can click on the button ”Add
Waypoints” and then you can add the waypoints to the supply locations.
To accommodate these changes, you would need to make modifications to the code. This will require
you to implement the remaining two findPath method from PathFindingService. These are the
steps you should follow:
• Step 1: Implement the findPath method that takes the start and end Tiles as its input. This method
is very similar to the one implemented in Level 4. The only change would be to generate the path to
the specific destination tile received as input. For this purpose, notice that Dijkstra’s algorithm will
never visit each node in the graph (reachable from the source) exactly once. This means that once
a node has been visited by the algorithm, one is already able to figure out what is the shortest path
from the source to this node.
• Step 2: Implement the last and final findPath method, which takes a starting node and a list of
waypoints as input. This method builds the shortest paths from the source to the destination, making
sure to visit the each of the waypoints in the order in which they have been provided as input. Use
the other methods that you have already implemented to help you find such path. Please note that:
the destination tile will not be provided within the list of waypoints. You can figure out which one
is the destination tile by accessing the field isDestination from the Tile class.
13
Testing
For testing this code, you can open Map 1 or Map 2. You can click on ”Add Waypoint” and add waypoints
anywhere on the map. Then, you can click on ”Shortest Path” to get a path traversing through your supply
pointa and going to the final destination. Fig 12 gives a graphical example of sample output. In the figure,
we have added two waypoints(W1, W2) and the path traverses through both of them.
(a) Shortest path with waypoints for Map 2 (b) Fastest path with waypoints for Map 2
Level 6 [5 pts]
The elders, who asked you to create this app, seem to be impressed with your ingenuity. However, they
feel that this app could use one more feature and that is to find the fastest path. This would be particularly
useful for night travel as it makes sense to quickly reach the safe house when zombies are the sharpest.
To find the fastest path, you are provided with a class called FastestPath that extends
PathFindingService. Thankfully, you have already implemented your algorithms to find a minimum weight path inside PathFindingService, so all you need to do is generate a graph with the
appropriate weights, since in this case you want the algorithm to run on a graph that is weighted by the
time cost. Override generateGraph() in the class FastestPath (similarly to how you did before)
to achieve this.
Testing
To test the code, you can open Map 1, and Map 2 and click on the button ”Fastest Path”. The path should
be highlighted using a red line. You can simulate the path by going into [Control] →[Start Simulation], to
get a sense of the simulation. You can get a sense of the path by looking at the figure below.
14
Figure 10: Expected output for the fastest path on Map 2
Level 7 [5 pts]
Building up on your previous level, you thought that it might be better if you integrate the metro stations
available all around the city. After mulling over it, you thought that people would reach the safe house at
a faster pace using the available metro stations. Hence, you decided to add this feature to the app.
To integrate the subway in your logic, you would need to make a few modifications in your code. The
following are the steps to add the subway logic in your code
• You have been supplied with a class named MetroTile. You have already initialized a constructor
that declares all the variables. Your first task is to implement another method called fixMetro
that assigns different distance and time costs to metro tiles. This method takes a Tile as input.
If such tile is another metro tile, then the time and distance costs (i.e. metroTimeCost and
metroDistanceCost) to travel between these two tiles should be computed based on how far
the two tiles are. The following are the formulae for calculating the time and distance cost going
from one metro station to another:
metroT imeCost = M(t1, t2) ∗ metroCommuteF actor
metroDistanceCost = M(t1, t2)/metroCommuteF actor
where the metroCommuteFactor variable is set to 0.2 for now. M(t1, t2) is the Manhattan
distance between t1 and t2, use Tile class’s xCoord and yCoord to access their 2-D coordinate and
use the formula below:
M(t1, t2) = abs(t1.xCoord − t2.xCoord) + abs(t1.yCoord − t2.yCoord)
15
Note that when adding more than 2 metro stations things are getting more complicated because each
pair of metro tiles would have their own cost based on the distance, so to simplify this you can
assume there are only two metro stations in the district (poor public transportation).
• Modify your code, so that the graph generated by generateGraph() in both FastestPath
and ShortestPath class now considers metro weights. That is, whenever you try to add an edge
to the graph, if both the start and the end tile for a edge are MetroTile, then you need to set the
edge’s weight/cost using the corresponding value computed in the previous step. Please note that
which part of the code you will need to modify really depends on your implementation.
Testing
To test this code, you can go to Map 3 and click on the ”Fastest Path” Button. A sample output has been
attached below.
Figure 11: Expected output after integrating metro in Fastest Path
Level 8 [15 pts]
At this stage, you should have implemented Dijkstra’s algorithm and created two strategies, one for the
shortest distance and the other for the fastest time. However, our agents reported back that the suggested path sometimes would lead our people into the zombie-infected area whenever scavenging more
dangerous districts (Map 4). These paths do not seem to guarantee our people’s safety. Therefore, our
post-apocalypse path-finding service needs a new feature for an optimal path without safety concerns. To
simulate and evaluate the possible risk, our agent now has a fixed health (HP) and will take damage when
traveling through a dangerous area. Whenever the HP reaches 0 or below, it means our agent’s safety
is severely affected, thus the path should not be considered. Our goal is to find the shortest path while
preventing our agent from dying.
16
This type of problem is called constrained shortest path (CSP) and you will need to implement an
algorithm that is known for solving this problem called LARAC (Lagrangian Relaxation Based Aggregated Cost) algorithm. In simple words, the algorithm introduces aggregated cost to replace graph
cost (weight) and optimize it through iterations until it finds the optimal cost (weight) that satisfies the
constraint. To know more about the mathematical theory behind it, check out some resources here.
When you first began this project, you have set up various types of costs for each type of tile (region),
including damageCost, which hasn’t been used yet. The field damageCost represents how much
damage our agent takes when walking on this tile.
For this section, you need to complete the SafestShortestPath class which holds the logic for
computing the safest shortest path for our agent. This class has the following fields:
• A integer field health, model and visualize our agent’s life status.
• A Graph called costGraph that uses the distance cost as the edges’ weights.
• A Graph called damageGraph that uses the damage cost as the edges’ weights.
• A Graph called aggregatedGraph that uses the aggregated cost as the edges’ weights.
To complete the class, you need to implement the following methods:
• generateGraph() : like for the other two class, you need to override this method so that it
initializes the three graphs listed above. For costGraph initialize all edges’ weight using the
d
软件开发、广告设计客服
QQ:99515681
邮箱:99515681@qq.com
工作时间:8:00-23:00
微信:codinghelp
热点项目
更多
代做ceng0013 design of a pro...
2024-11-13
代做mech4880 refrigeration a...
2024-11-13
代做mcd1350: media studies a...
2024-11-13
代写fint b338f (autumn 2024)...
2024-11-13
代做engd3000 design of tunab...
2024-11-13
代做n1611 financial economet...
2024-11-13
代做econ 2331: economic and ...
2024-11-13
代做cs770/870 assignment 8代...
2024-11-13
代写amath 481/581 autumn qua...
2024-11-13
代做ccc8013 the process of s...
2024-11-13
代写csit040 – modern comput...
2024-11-13
代写econ 2070: introduc2on t...
2024-11-13
代写cct260, project 2 person...
2024-11-13
热点标签
mktg2509
csci 2600
38170
lng302
csse3010
phas3226
77938
arch1162
engn4536/engn6536
acx5903
comp151101
phl245
cse12
comp9312
stat3016/6016
phas0038
comp2140
6qqmb312
xjco3011
rest0005
ematm0051
5qqmn219
lubs5062m
eee8155
cege0100
eap033
artd1109
mat246
etc3430
ecmm462
mis102
inft6800
ddes9903
comp6521
comp9517
comp3331/9331
comp4337
comp6008
comp9414
bu.231.790.81
man00150m
csb352h
math1041
eengm4100
isys1002
08
6057cem
mktg3504
mthm036
mtrx1701
mth3241
eeee3086
cmp-7038b
cmp-7000a
ints4010
econ2151
infs5710
fins5516
fin3309
fins5510
gsoe9340
math2007
math2036
soee5010
mark3088
infs3605
elec9714
comp2271
ma214
comp2211
infs3604
600426
sit254
acct3091
bbt405
msin0116
com107/com113
mark5826
sit120
comp9021
eco2101
eeen40700
cs253
ece3114
ecmm447
chns3000
math377
itd102
comp9444
comp(2041|9044)
econ0060
econ7230
mgt001371
ecs-323
cs6250
mgdi60012
mdia2012
comm221001
comm5000
ma1008
engl642
econ241
com333
math367
mis201
nbs-7041x
meek16104
econ2003
comm1190
mbas902
comp-1027
dpst1091
comp7315
eppd1033
m06
ee3025
msci231
bb113/bbs1063
fc709
comp3425
comp9417
econ42915
cb9101
math1102e
chme0017
fc307
mkt60104
5522usst
litr1-uc6201.200
ee1102
cosc2803
math39512
omp9727
int2067/int5051
bsb151
mgt253
fc021
babs2202
mis2002s
phya21
18-213
cege0012
mdia1002
math38032
mech5125
07
cisc102
mgx3110
cs240
11175
fin3020s
eco3420
ictten622
comp9727
cpt111
de114102d
mgm320h5s
bafi1019
math21112
efim20036
mn-3503
fins5568
110.807
bcpm000028
info6030
bma0092
bcpm0054
math20212
ce335
cs365
cenv6141
ftec5580
math2010
ec3450
comm1170
ecmt1010
csci-ua.0480-003
econ12-200
ib3960
ectb60h3f
cs247—assignment
tk3163
ics3u
ib3j80
comp20008
comp9334
eppd1063
acct2343
cct109
isys1055/3412
math350-real
math2014
eec180
stat141b
econ2101
msinm014/msing014/msing014b
fit2004
comp643
bu1002
cm2030
联系我们
- QQ: 9951568
© 2021
www.rj363.com
软件定制开发网!