首页
网站开发
桌面应用
管理软件
微信开发
App开发
嵌入式软件
工具软件
数据采集与分析
其他
首页
>
> 详细
MIE262讲解、辅导CS,Python程序设计、Java,c++编程辅导 辅导留学生 Statistics统计、回归、迭代|讲解R语言编程
项目预算:
开发周期:
发布时间:
要求地区:
MIE262: Operations Research I, Lab project D.M. Aleman
Lab project: WARP Shoe Company
Contents
1 Introduction 1
2 Problem statement 1
3 Questions 2
4 Assignment 3
5 Database tables 3
6 Helpful hints 4
1 Introduction
The WARP Shoe Company is one of the oldest shoe companies in Canada. Over the past
three years, the WARP management found it helpful and sometimes profitable to consult
with students from the department of Industrial Engineering of the University of Toronto.
Please make yourselves familiar with the information on the company’s website:
S:\ecfpc\warp\WarpShoes.Inc
All information needed on the WARP Shoe Company, including the database, can be found
at
S:\ecfpc\warp\Warp2011W.mdb
The management of WARP Shoe Company would like to thank you in advance for your
effort and help.
2 Problem statement
At the beginning of year 2006, one of the major market competitors of WARP went bankrupt.
Thus, WARP market analysts predict that for the month of February the demand for all
types of shoes will double. Assume that closing inventory of January 2006 was zero for all
types of shoes. Assume also that all sales happen at the end of the month.
The management of WARP wants to know what is the most profitable production plan.
You are advised to take the following considerations into account:
1
MIE262: Operations Research I, Lab project D.M. Aleman
• The budget for raw materials is $10,000,000.
• Sales price on shoes remains the same as in the Product Master Table.
• Not meeting the demand for any type of shoe means loss of new potential customers,
and hence has been evaluated at a cost of $10/pair. Demand for each month from
1997-2003 can be found in the Product_Demand table.
• It has been decided that during February 2006 the WARP shoe production plant,
including all machines, will work up to 12 hours a day, 28 days a month. The cost of
operation of each machine is given in the Machine_Master table. Assume that setup
times and costs are negligible. The amount of time (s) each shoe requires from each
machine is given in the Machine_Assign table.
• Workers are paid on an hourly basis at the rate of $25/hour. Each machine has to be
operated by one worker.
• The total warehouse capacity can be obtained from the Warehouse_Master table.
• Transportation costs can be ignored.
• The manufacturing sequence can be ignored.
3 Questions
If you had to use the LP relaxation method (see Hint 2 in Section 6), answer all questions
for the LP relaxation solution unless the question specifically states otherwise.
1. How should you estimate the demand for the month of February?
2. How many variables and constraints do you have?
3. If you had to relax your integer program to an LP, how many constraints were violated
after rounding the LP solution to the closest integer solution?
4. Which constraints are binding, and what is the real-world interpretation of those binding
constraints?
5. Assume that some additional warehouse space is available at the price of $10/box of
shoes. Is it economical to buy it? What is the optimal amount of space to buy in this
situation?
6. Imagine that machines were available for only 8 hours per day. How would your solution
change? Which constraints are binding now? Does the new solution seem realistic to
you?
7. If in addition there were a $7,000,000 budget available to buy raw materials, what
would you do? Change your formulation and solve again.
2
MIE262: Operations Research I, Lab project D.M. Aleman
4 Assignment
Complete the following:
• Formulation of the problem (decision variables, objective function, constraints)
• Gurobi solution report
• Answers to the questions in Section 3.
• Explanation of obtained results
To solve this problem, you will need to obtain data from the database. The relevant database
contents are described in Section 5.
5 Database tables
Table Description Contents
Product_Master Basic product info Product name
Sales price
Product_Demand How much was sold by each store per month Year
Month
Store number
Demand
Machine_Master Basic machine info Machine name
Setup cost per month
Operating cost per
minute
Setup time (min)
Section
Machine_Assign The processing time of each shoe on each
machine
Product number
Machine number
Average duration (s)
Step number
RM_Master Basic raw material info Raw material name
Cost
Available quantity
Category
BOM Bill of materials (raw material required per
product)
Product number
Raw material number
Quantity required
3
MIE262: Operations Research I, Lab project D.M. Aleman
6 Helpful hints
1. It might be helpful to construct (or consider) the following tables:
• Shoe type and profit from selling of one pair
• Machine number, product number, and average processing time required
2. If the computational time for solving your integer model is more than 10 minutes, relax
your model to an LP by removing the integer requirements for the variables. After
solving the relaxed LP model, round the values of the relaxed variables to the closest
integer (round up if the decimal part is ≥ 0.5, and round down otherwise). This LP
relaxation method is a common workaround to get decent solutions to IPs quickly.
4
软件开发、广告设计客服
QQ:99515681
邮箱:99515681@qq.com
工作时间:8:00-23:00
微信:codinghelp
热点项目
更多
代写dts207tc、sql编程语言代做
2024-12-25
cs209a代做、java程序设计代写
2024-12-25
cs305程序代做、代写python程序...
2024-12-25
代写csc1001、代做python设计程...
2024-12-24
代写practice test preparatio...
2024-12-24
代写bre2031 – environmental...
2024-12-24
代写ece5550: applied kalman ...
2024-12-24
代做conmgnt 7049 – measurem...
2024-12-24
代写ece3700j introduction to...
2024-12-24
代做adad9311 designing the e...
2024-12-24
代做comp5618 - applied cyber...
2024-12-24
代做ece5550: applied kalman ...
2024-12-24
代做cp1402 assignment - netw...
2024-12-24
热点标签
mktg2509
csci 2600
38170
lng302
csse3010
phas3226
77938
arch1162
engn4536/engn6536
acx5903
comp151101
phl245
cse12
comp9312
stat3016/6016
phas0038
comp2140
6qqmb312
xjco3011
rest0005
ematm0051
5qqmn219
lubs5062m
eee8155
cege0100
eap033
artd1109
mat246
etc3430
ecmm462
mis102
inft6800
ddes9903
comp6521
comp9517
comp3331/9331
comp4337
comp6008
comp9414
bu.231.790.81
man00150m
csb352h
math1041
eengm4100
isys1002
08
6057cem
mktg3504
mthm036
mtrx1701
mth3241
eeee3086
cmp-7038b
cmp-7000a
ints4010
econ2151
infs5710
fins5516
fin3309
fins5510
gsoe9340
math2007
math2036
soee5010
mark3088
infs3605
elec9714
comp2271
ma214
comp2211
infs3604
600426
sit254
acct3091
bbt405
msin0116
com107/com113
mark5826
sit120
comp9021
eco2101
eeen40700
cs253
ece3114
ecmm447
chns3000
math377
itd102
comp9444
comp(2041|9044)
econ0060
econ7230
mgt001371
ecs-323
cs6250
mgdi60012
mdia2012
comm221001
comm5000
ma1008
engl642
econ241
com333
math367
mis201
nbs-7041x
meek16104
econ2003
comm1190
mbas902
comp-1027
dpst1091
comp7315
eppd1033
m06
ee3025
msci231
bb113/bbs1063
fc709
comp3425
comp9417
econ42915
cb9101
math1102e
chme0017
fc307
mkt60104
5522usst
litr1-uc6201.200
ee1102
cosc2803
math39512
omp9727
int2067/int5051
bsb151
mgt253
fc021
babs2202
mis2002s
phya21
18-213
cege0012
mdia1002
math38032
mech5125
07
cisc102
mgx3110
cs240
11175
fin3020s
eco3420
ictten622
comp9727
cpt111
de114102d
mgm320h5s
bafi1019
math21112
efim20036
mn-3503
fins5568
110.807
bcpm000028
info6030
bma0092
bcpm0054
math20212
ce335
cs365
cenv6141
ftec5580
math2010
ec3450
comm1170
ecmt1010
csci-ua.0480-003
econ12-200
ib3960
ectb60h3f
cs247—assignment
tk3163
ics3u
ib3j80
comp20008
comp9334
eppd1063
acct2343
cct109
isys1055/3412
math350-real
math2014
eec180
stat141b
econ2101
msinm014/msing014/msing014b
fit2004
comp643
bu1002
cm2030
联系我们
- QQ: 9951568
© 2021
www.rj363.com
软件定制开发网!